4036594
Heigwein
ZDA-1225P/HEG18596
Pipe set
Outer pipe length: 12250mm
A transfer pipe must be provided up to just before the end of the igniter pipe.
If necessary, connect cooling at temperatures >250C between the transfer gap and the outer pipe. Handling such a long ignition burner requires great care.
Air supply
Air supply: Forced air
Combustion air temperature: Ambient temperature
Air connection: Rp1
Air operating pressure: 133 mbarü
Air volume flow: 50Nm3/h, the rest must be available from the combustion chamber
Fuel supply
Gas type: propane gas
Gas connection: Rp1/2
Gas operating pressure: 150-250 mbarü
Max. gas volume flow: 4Nm3/h
Thermal rated power: 120kW